Wholesale & net-terms accounts for integratorsWholesale login · Apply for terms · Contact
cropped-Facebook.jpgWireless Bridge Store

Ubiquiti airMAX Rocket Prism 5AC 360° Omni Antenna with NanoStation Loco 5AC Point to Multi Point(WBS-PTMP-RocketAC-360-NS-L5AC)

$555.80 – $1,465.00
Wholesale account? Sign in for your tier price and Net-30 terms.
Will this reach? Check your distance and mount heights →

Ubiquiti airMAX Rocket Prism 5AC

Ubiquiti airMAX Rocket Prism 5AC (RP-5AC-Gen2
)
 radio with the airMAX Omni’s(AMO-5G13) creates a powerful, 360° omnidirectional base station. This seamless integration gives network architects unparalleled flexibility and convenience.

 

  • SHARE YOUR INTERNET: Share your local network with all of your buildings without having to dig trenches and run wire! Finally, the Internet in the shop for email and youtube.
  • PLUG AND PLAY: Just plug one ethernet cable into your Local Area Network and the included power/LAN brick, and the other ethernet cable which supports Power over Ethernet into the airMAX Rocket Prism 5AC
    and the NanoStation Loco 5AC US. Point them at each other. That’s It!
  • NO CONFIGURATION NEEDED: We did all the hard work. Each pair is expertly configured in Transparent Bridge Mode with a randomly generated unique WPA Key. Once they are connected, the remote buildings are now on your local network.
  • ONE INTERNET BILL: Stop paying your ISP for a separate Internet connection for your other buildings. Connect them with this outdoor wireless bridge to your main building and save!
  • LONG DISTANCE HIGH SPEED: This Kit uses the 5GHz band. With a clear line of sight, these transmitters can create a wireless bridge miles apart! These wireless network extenders are capable of speeds up to 450 Mbps.
  • WHICH WIRELESS BRIDGE IS RIGHT FOR YOU: Check our Chart or Contact us and let us know your project goals, and we’ll help you decide.

Not sure where to place your units or how high to place them? Try checking out your location with Ubiquiti’s tools Or LigoWave’s tools  or we can do it for you. Just contact us.

Ubiquiti airMAX Rocket Prism 5AC

Technical Specifications

Loco5AC
Mechanical
Dimensions 179 x 77.5 x 59.1 mm (7.05 x 3.05 x 2.33″)
Weight 0.18 kg (6.35 oz)
Enclosure material UV-stabilized plastic
Mounting Pole mounting kit (Included)
Hardware
Networking interface (1) GbE RJ45 port
Power method Passive PoE 2-Pair (Pairs 4, 5+; 7, 8 Return)
Power supply 24V, 0.3A Gigabit PoE supply*
*PoE adapter not included.
Supported voltage range 24V ±10%
Max. power consumption 8.5W
LEDs Power, Ethernet, (4) signal strength
Operating temperature -40 to 70° C (-40 to 158° F)
Operating humidity 5 to 95% noncondensing
Certifications CE, FCC, IC
System
Gain 13 dBi
Channel bandwidths 10/20/30/40/50/60/80 MHz
Cross-pol isolation 20 dB min.
Max. VSWR 1.8:1
Beamwidth 45° (H-pol) / 45° (V-pol) / 45° (Elevation)
Polarization Dual linear
Operating Frequency (MHz)
Worldwide 5150-5875 MHz
USA
U-NII-1
U-NII-2A
U-NII-2C
U-NII-3
5150-5250 MHz
5250-5350 MHz
5240-5725 MHz
5725-5850 MHz
Management Radio (MHz)
Worldwide 2412 – 2472 MHz
US/CA 2412 – 2462 MHz

Technical Specifications

Mechanical
Dimensions 88 x 40 x 230 mm (3.47 x 1.58 x 9.06″)
Weight 400 g (14.11 oz)
Enclosure material Die-cast aluminum
Mounting Pole mounting (kit Included)
Wind loading 342.5 N at 200 km/h (77 lbf at 125 mph)
Hardware
Networking interface (1) GbE RJ45 port
RF Connectors (2) RP-SMA (Waterproof)
(1) GPS (Waterproof)
Power method Passive PoE (pairs 4, 5+; 7, 8 return)
Power supply 24V, 1A Gigabit PoE adapter (Included)
Supported voltage range 18—26V DC
Max. power consumption 9.5W
LEDs (4) Signal strength: software_adjustable to correspond to custom RSSI levels
GPS, LAN, power
RoHS compliance Yes
Shock and vibrations ETSI300-019-1.4
Operating temperature -40 to 80° C (-40 to 176° F)
Operating humidity 5 to 95% noncondensing
Certifications CE, FCC, IC
Software
Modes Access Point, station
Channel sizes
PtP mode
PtMP mode
10/20/30/40/50/60/80 MHz
10/20/30/40 MHz
Services Web server, SNMP, SSH server, telnet , ping watchdog, DHCP, NAT, bridging, routing
Utilities airMagic, airView, antenna alignment tool, discovery utility, site survey, ping, traceroute, speed test
Distance adjustment Dynamic Ack and Ackless mode
Power adjustment Software adjustable UI or CLI
Security WPA2 AES only
QoS Supports packet level classification WMM and user customer level: High/Medium/Low
Statistical reporting Up time, packet errors, data rates, wireless distance, Ethernet link rate
Ubiquiti specific features 30/50/60 MHz Channels, airMAX ac mode, traffic shaping with burst support, discovery protocol, frequency band offset, Ackless mode
Operating Frequency (MHz)
Worldwide 5150–5875 MHz
USA
U-NII-1:
U-NII-2A:
U-NII-2C:
U-NII-3
5150–5250 MHz
5250–5350 MHz
5470–5725 MHz
5725–5850 MHz
Management Radio (MHz)
Worldwide 2412–2472 MHz
USA 2412–2462 MHz

Technical Specifications

AMO-5G13
Dimensions 799 x 90 x 65 mm (31.5 x 3.5 x 2.6″)
Weight 820 g (1.8 lb)
Frequency Range 5.45 – 5.85 GHz
Gain 13 dBi
Elevation Beamwidth 7°
Max VSWR 1.5:1
Downtilt 2°
Wind Survivability 200 km/h (125 mph)
Wind Loading 84.52 N @ 200 km/h (19 lbf @ 125 mph)
Polarization Dual-Linear
Cross-pol Isolation 25 dB min.
ETSI Specification EN 302 326 DN2

Related products